Work orders
AI-native work orders streamline dispatch and management across large teams.
Work orders →AI-powered facilities operations
Edviro autonomously finds and fixes waste. Facilities managers do not need more dashboards or alarms — they need systems that continuously improve and take action. Alarms, inefficiencies, and staff requests become reviewed work orders, dispatched technicians, and verified results across every site you run.
Y Backed by Y CombinatorWe save three things
How it works
Edviro watches your building 24/7 across utility data, BMS/BAS, and asset and maintenance logs — entirely vendor-agnostic.
In action
A staff request followed all the way through: diagnosis, a drafted order, a named approval, the technician, and the check that the problem actually stopped.
Room 214 is freezing again. Kids are in coats. Can someone look at it?
On it. Room 214 is served by RTU-3 in Building B. Checking its history and this morning’s schedule.
Drafted a work order: the heating stage on RTU-3 isn’t firing, third time in 30 days. It’s with D. Park for review.
Approved. Luis M. (HVAC) is on the way, ETA about 45 min. I’ll text you when the room is back to setpoint.
Any update? Still pretty cold in here.
Luis is at RTU-3 now replacing the igniter. You should feel heat in about 15 minutes; I’ll confirm once the room holds 70°F.
Room 214 is back at 70°F and holding. Closing this out. Thanks for flagging it.
RTU-3 heating stage not firing — Room 214
Continuous optimization
Edviro learns each site’s baseline, flags anomalies, finds the likely cause, and measures the results.
Schedule override left RTU-3 in occupied mode overnight
Measured against the learned baseline after the schedule fix
Platform
Use Edviro as your CMMS, or connect the one you already have.
AI-native work orders streamline dispatch and management across large teams.
Work orders →Edviro learns each site’s baseline and flags anomalies, with the likely cause.
Next inspection Oct 15 · 3 failures in 30 days
Easy asset tagging with our mobile app. Scan nameplates and maintain a detailed report on service history, documents, and inspection schedules.
Asset management →Verified over 30 days against the learned baseline
Verified results and repeat failures help repair-or-replace decisions and capital plans.
Capital planning →Connect the systems you run today; integration scope is confirmed system by system.
Keep what works. Consolidate what doesn’t.Replace or integrate your CMMS →
Industries
Warm end of aisle B closest to the design limit.
Verify cooling changes against measured telemetry before adding load.
Data centers →Energy, work orders, assets, and capital planning for K‑12 and higher ed.
Education →Devices near zero after 6 pm; zone still conditioned.
Occupancy-aware HVAC across a portfolio, with every change reviewed first.
Commercial real estate →Documented, reviewed work across critical environments and support spaces.
Healthcare →Weeks 3–4 ran over the design model; back to model after commissioning.
Independent baselining and M&V from construction through handoff.
Construction →Education proof
Edviro’s deepest deployments are K‑12 districts; the results below are education results.

Connect your sites. Find the problems. Close the loop.